Welcome great EduPodian, here is your Third Term JSS3 Basic Technology Lesson Note excerpt.

Scheme of Work

WEEK 1: SIMPLE ELECTRICAL WIRING
WEEK 2: BUILDING (FOUNDATION)
WEEK 3: BUILDING (WALLS)
WEEK 4 – BECE: REVISIONS

Week 1:
Topic: Simple Electrical Wiring
Content
• Electrical Circuit
• Wiring Tools
• Accessories
Electric Circuits
An electric is a complete path through which electrons or current flows. The path is made up of cable or wire which connect all the components of the circuit.
Components of… Click here to order the complete Basic Technology Lesson Note for JSS3 third term

Week 2:

Topic: BUILDING (Foundation)

Content:
• Definition and function of foundation
• Types of foundation
Foundation
The foundation in its widest sense can be said to be expanded base of a wall or a column in addition to the ground or sub-soil, which the building stands is the natural foundation, and the expanded base which is constructed with concrete or masonry materials like rocks, stone, or bricks is called the artificial foundation. However, when the word ‘foundation’ is used ordinarily, it means artificial foundation. In a swampy and waterlogged area, foundation also embraces the long concrete poles driven, or concrete cast into bored holes for purposes of carrying the structure above it.
Function of Foundation
The foundation, acting as a large flat-heeled shoe worn by the building, bears the total weight of the building and ensures… Click here to order the complete third term Basic Technology Lesson Note for JSS3

Week 3:

Topic: BUILDING (Walls)

Content:
• Materials foe wall making
• Types of walls
• Bonding materials
Wall
Walls are continuous vertical structure of a building which are built primarily to perform any or a combination of these functions:
i. Enclose space, as in the external walls of a building, boundary or fence wall, reservoirs, and so on.
Ii. Divide space as in partition and compartment walks.
iii. Carry load and provide support for other elements and fitments for the building structure like the load of the floor and the roof above, windows, electrical fittings, air conditioners, sanity and water supply fitments.
Walks in the building can, in addition, be used as a… Click here to order the complete Lesson Note on Basic Technology JSS3 third term

Week 4:
Get the complete third Term JSS3 Basic Technology Lesson Note
Week 5:
Get the complete JSS3 Lesson Note on Basic Technology third term
Week 6:
Get the complete JSS3 third term Lesson Note on Basic Technology
Week 7:
Get the complete third Term JSS3 Basic Technology Lesson Note
Week 8:
Get the complete lesson for JSS3 Basic Technology third term
Week 9:
Get the complete third term Lesson Note on Basic Technology JSS3
Week 10:
Get the complete third Term JSS3 Basic Technology Lesson Note

PS: You can download the Complete MS Word (editable) Version of this note directly to your device (phone or computer). To download, CLICK HERE.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *